Looking for a specific document?
Find manuals, guidelines and standards for working on our infrastructure. Search below or try selecting a filter to narrow the results.
-
SA Power Networks Connections & Ancillary Network Services
This manual (Manual 18) outlines the list of fixed and quoted fees for Connections and Ancillary Network Services. These fees have been prepared in accordance with the AER approved Regulatory Determination for SA Power Networks.
Test link
This manual (Manual 18) outlines the list of fixed and quoted fees for Connections and Ancillary Network Services. These fees have been prepared in accordance with the AER approved Regulatory Determination for SA Power Networks.
Test link
-
Technical standard TS-101 - Public Lighting - Design and Installation
This document specifies the public lighting standards, including flood lighting, which are either new and/or upgraded installations that will be a connected to SA Power Networks distribution network.
This document specifies the public lighting standards, including flood lighting, which are either new and/or upgraded installations that will be a connected to SA Power Networks distribution network.
-
Addressing Power Factor Non-Compliance at ElectraNet Connection Points - Draft Preliminary Assessment Report (DPAR)
The Addressing Power Factor Non-Compliance at ElectraNet Connection Points Draft Preliminary Assessment Report (DPAR) has been prepared in accordance with clause 5.17.4 of the National Electricity Rules (NER). It is the second stage of the formal consultation process set out in the NER in relation to applying the RIT-D. This DPAR follows the publication of the Options Screening Report (OSR) by SA Power Networks. SA Power Networks has concluded that there will not be a non-network option or stand-alone power system (SAPS) option. The Closing date for submissions is 6 weeks from publication. Submissions close on 15 September 2025.
The Addressing Power Factor Non-Compliance at ElectraNet Connection Points Draft Preliminary Assessment Report (DPAR) has been prepared in accordance with clause 5.17.4 of the National Electricity Rules (NER). It is the second stage of the formal consultation process set out in the NER in relation to applying the RIT-D. This DPAR follows the publication of the Options Screening Report (OSR) by SA Power Networks. SA Power Networks has concluded that there will not be a non-network option or stand-alone power system (SAPS) option. The Closing date for submissions is 6 weeks from publication. Submissions close on 15 September 2025.
-
External contractors contact list
This document provides the contact list of external contracting companies (ie Designers/ Consultants, Electrical and Civil), which are listed by SA Power Networks, who may be able to undertake a range of services associated with the installation of the electrical infrastructure, but the list does not necessarily reflect all of the contracting companies that have suitable accreditation.
This document provides the contact list of external contracting companies (ie Designers/ Consultants, Electrical and Civil), which are listed by SA Power Networks, who may be able to undertake a range of services associated with the installation of the electrical infrastructure, but the list does not necessarily reflect all of the contracting companies that have suitable accreditation.
-
Public Lighting Tariff Manual
The purpose of this document (Manual 21) is to outline the service offering provided by SA Power Networks for provision of public lighting services, and associated maintenance and replacement fees for ongoing management (i.e. Tariffs).
The purpose of this document (Manual 21) is to outline the service offering provided by SA Power Networks for provision of public lighting services, and associated maintenance and replacement fees for ongoing management (i.e. Tariffs).
-
Network Information for Contractors and Customers NICC-270 - Connection of Medium and Large Embedded Generation greater than 30kVA
This document has been developed to assist proponents of embedded generating system in understanding the process and requirements associated with connecting inverter energy systems greater than 30kW and all rotating generation systems to the SA Power Networks distribution network.
This document has been developed to assist proponents of embedded generating system in understanding the process and requirements associated with connecting inverter energy systems greater than 30kW and all rotating generation systems to the SA Power Networks distribution network.
-
SA Power Networks Connection Policy
This Connection Policy sets out the regulatory timeframes and requirements for provision of customer connection offers, and the methodology for determining customer contributions (charges) relating to the creation and alteration of customer connections to the electricity distribution network.
This Connection Policy sets out the regulatory timeframes and requirements for provision of customer connection offers, and the methodology for determining customer contributions (charges) relating to the creation and alteration of customer connections to the electricity distribution network.
-
Model Terms & Conditions for Deemed Standard Connection Contract 3603
This contract is about the services which cover connection of your premises to our distribution system, and the energy supplied to the premises. These services are called "customer connection services".
This contract is about the services which cover connection of your premises to our distribution system, and the energy supplied to the premises. These services are called "customer connection services".